- Checklist
- 9 pages
- Reviewed 18 November 2026
Build, hire or extend your engineering team: the decision checklist.
Choose on four things, not on price alone: which roles and skills the roadmap needs, how long each route takes before an engineer is productive, who directs the work and owns the code, and what each route costs over the whole period. This checklist lists what to settle in each. It does not pick a route for you.
For CTOs, CIOs, VP Engineering and founders deciding how to add capacity.
- 37 tick-box questions in four sections, each with the reason it matters.
- A side-by-side worksheet for build, contractors and extend.
- Our terms in writing for Team Extension, so you can compare us on the same page.
No spam. One email with the PDF attached.
Checklist
Build vs Hire vs Extend: CTO Decision Checklist
Version 1 · Reviewed 18 November 2026
What is inside?See real questions before you ask for it.
Section 01 of 04 · 7 questions
- Which work on the roadmap for the next two quarters is not getting done today?Why it matters you are buying capacity for specific work, not headcount.
- Which roles does that work need, and at what level?Why it matters the route that suits one senior specialist rarely suits five mid-level engineers.
- Is the need permanent, or for a project or a peak?Why it matters time-bound needs favour flexibility.
Section 02 of 04 · 7 questions
- When must the first new engineer be productive?Why it matters it rules routes in or out before cost is even discussed.
- Build: how long did your last three hires take, from opening the role to a start date, including notice periods?Why it matters your own history is a better guide than any market figure.
- Contractors: how will you find and vet them, and who checks their work before it reaches your code?Why it matters vetting time is part of time to capacity.
Section 03 of 04 · 7 questions
- Who directs the day-to-day work and reviews the code?Why it matters it is the main difference between extending your team and handing work to a team someone else runs.
- Who owns the code, the designs and the accounts, and is that written in the contract before work starts?Why it matters ownership should never depend on goodwill.
- Where will the code and infrastructure live?Why it matters if they are yours from day one, nothing has to be handed back.
Section 04 of 04 · 16 questions
- Compare over the same period, for example twelve months, and include the time before each route is productive.Why it matters a lower rate that starts later can cost more over the period.
- Write down what it costs to change your mind: notice, exit costs and the time to hand over knowledge.
- Add the cost of the work not getting done this quarter.Why it matters a delay has a cost of its own, even if it never appears on an invoice.
Worksheet: the three routes side by side
Fill in each cell from your own answers. Leave a cell blank rather than guess.
| Question | Build (hire) | Contractors | Extend (partner) |
|---|---|---|---|
| Roles and level covered | |||
| Date the first engineer is productive | |||
| Who directs the work | |||
| Who owns code and accounts, and where it is written | |||
| Minimum commitment and notice |
What else should I know first?Four quick answers
Does it cost anything?
No. The checklist is free. You give your name, work email, role and country, and we email you the PDF.
What happens to my details?
We use them to email you this checklist and, only if you tick the box, so someone from ValueCoders can contact you about it. We keep the request for 90 days. To see or delete what we hold, email hello@valuecoders.com with "Privacy" in the subject. We reply within 30 days.
Will someone call me?
Only if you ask. Tick the box on the form and your account owner will reply by email. Leave it unticked and you get one email with the PDF attached, and nothing else from this form.
How current is it?
It was last reviewed on 18 November 2026, the date printed on its cover. When the checklist changes, the date here changes with it.
Checklist · PDF · free
Settle the decision before you hire, extend or outsource.
One email, the PDF attached, in about a minute.