For a data layer that has outgrown the platform underneath it

Data Modernization

A healthy application can still sit on top of a data layer nobody trusts. That layer might be a database groaning under load it was never sized for, pipelines that fail silently, or a schema built for a business a fraction of its current size. This practice treats the data layer as its own system, separate from any application logic running above it.

AI augmented, human governedEvidence before estimatesYour IP from day oneOne accountable owner per engagementFounded in 2011. Part of the Vinove Group500+ full-time engineers, as of September 2026NASSCOM member
Watch · the 90-second brief

How a legacy data estate gets moved forward

Database migration, pipeline rebuilds and schema redesign, and how each stays reconciled against the original.

90 secWatch without filling in a form.
A legacy database migration reconciled against its source.90 secSample frame · video pending

01Before touching the schema

Migrate in place or redesign is a real decision

Teams often redesign a schema when a simpler platform migration would have solved the actual complaint. Four questions settle which move the evidence supports.

Is the pain performance, or is it the shape of the data?

Slow queries on an otherwise sound schema point at a platform migration. Constant workarounds point at the schema itself.

How many systems currently write to this data?

A single writer tolerates a bigger structural change more easily than a schema shared across a dozen applications.

How much history has to move with the migration?

Years of historical data raise the reconciliation effort regardless of which approach gets chosen, and should be sized upfront.

Can dependent systems tolerate a phased cutover?

A schema redesign is safer behind compatibility views for systems that cannot change immediately alongside the migration.

Platform migration against schema redesign
Platform migrationSchema redesign
What changesThe database engineThe structure of the data
Typical triggerLoad past the engine's ceilingWorkarounds piling up around the model
Application impactUsually minimalRequires coordinated updates
Best fitSound schema, wrong platformSound platform, wrong schema

02Agreed before the first pipeline is touched

The ledger that keeps the migration honest

Data projects drift when reconciliation gets treated as optional under deadline pressure. This ledger fixes what you bring, what we migrate, what returns, and what stays your call to make.

  1. Your side

    You bring

    • The current database, its schema and its load patterns
    • Every application and report reading from it today
    • Any maintenance windows the business can tolerate
  2. Our side

    We build

    • A migration to a database platform sized for current scale
    • A validated, reconciled copy of the historical data
    • A cutover sequence that keeps dependent applications reading correctly
  3. Your side

    You receive

    • A production database running on a platform built for the current load
    • A reconciliation report proving no data was lost in transit
    • Query performance measured before and after the move

Never leaves you

  • Every application and report that reads from the database
  • The final decision on which platform to move to
  • Ownership of the data itself throughout the migration

Where the line sitsA database migration is only finished once every dependent system is verified against the new platform, not merely once the copy completes.

03From reconciliation plan to cutover

Four stages, each closing on proof

Data migrations that lose trust usually skipped one of these stages. This system closes each one with a number you can check, not a promise.

  1. Map sources, pipelines and dependents

    Every database, pipeline and downstream report gets catalogued before a migration plan gets written, including the undocumented ones.

    The current estate, mapped honestly
  2. Define how correctness gets proven

    The method for verifying that migrated data matches its source is agreed before migration starts, not improvised afterward.

    A reconciliation method agreed upfront
  3. Migrate and reconcile in parallel

    Data moves in stages, with each stage checked against the reconciliation method before the next stage begins.

    Data moved and checked, not just copied
  4. Cut over with the source kept live

    Dependent systems switch over in a controlled sequence, with the original source kept available until every switch is verified.

    A cutover with the old source still available

04What actually moves the number

Four drivers, priced from a short assessment

Data modernization is priced against the estate mapping, because these four factors change scope by multiples.

Driver 01

Volume of historical data to reconcile

Years of accumulated history take longer to verify than a system that has only been in production for a short while.

Driver 02

Number of dependent applications and reports

Each downstream consumer adds its own verification step before it can safely read from the new source.

Driver 03

Whether the schema changes shape, not just platform

A like-for-like platform migration is simpler than a redesign that also changes how the data is structured.

Driver 04

Tolerance for a phased, longer cutover

A tighter cutover window compresses the schedule but increases the verification work needed to trust it.

05Evidence and proof

Data estates people finally stopped double-checking.

Data modernization proof is a number nobody feels the need to verify by hand anymore. Every record here waits for written client approval before production.

Explore case studies
A legacy database migration reconciled against dependent reports.
Nexa Foundry · Industrial manufacturing, EU

A decade-old database migrated with every dependent report reconciled.

Nexa Foundry's core database was timing out under load a decade of growth had never been designed for. Migration to a modern platform was reconciled against every downstream report before cutover.

Reports reconciled before cutover
All of them
Query timeout incidents post-migration
Zero
Sample · pending client approval
A rebuilt data pipeline with automatic failure alerts.
Koru Health · Healthcare product, US

Pipelines rebuilt so a broken job finally raises an alarm.

Koru Health's nightly pipelines failed silently often enough that reports were routinely double-checked by hand. Rebuilt pipelines with monitoring ended the manual verification habit.

Silent pipeline failures after rebuild
None recorded
Manual report double-checks
No longer required
Sample · pending client approval
Portrait of a CTO reviewing reconciled migration results.

For the first time in years, our finance team stopped reconciling the numbers by hand before a board meeting.

Daniel MercerCTO, Vela Ledger
Sample · pending client approval

06Read this first

When data modernization is the wrong first move

Migrating a data estate before confirming where the real bottleneck sits risks solving the wrong problem well. The exits are marked plainly.

  • The data platform is fine; the application isn't

    Slow screens on top of a healthy, well-performing database point at application code, not the data layer underneath it.

    Application Modernization
  • There is no legacy estate, only a new build

    Standing up analytics or a data platform from scratch is new-build data engineering, not a migration off something old.

    Data practice
  • It is unclear whether data is even the priority

    When several systems compete for attention and the sequence is unclear, a roadmap should come before any migration commitment.

    Digital Transformation Consulting
Engagement shapes for data modernization
ShapeBest whenYou directWe carry
Platform migrationThe schema is sound, the engine isn'tCutover timing and maintenance windowsMigration, reconciliation and verification
Pipeline rebuildTrust in the numbers has broken downWhich reports matter mostRebuilt pipelines with monitoring
Schema redesignWorkarounds have accumulated around the modelBusiness rules the new schema representsDesign, migration and compatibility views

07Straight answers

Asked before a data migration budget is set.

How is this different from application modernization?

Application modernization rebuilds the code that reads and writes data. This practice rebuilds the data layer itself, the database, pipelines and schema, and the two are scoped as separate projects even when they run alongside each other.

Is this the same as your data practice for analytics work?

No. The data practice builds new analytics and data engineering capability from scratch. This practice specifically migrates a business off a legacy data estate that has outgrown its foundations.

Will our applications need to change during a data migration?

Often minimally, especially for a platform migration where the schema stays the same. A schema redesign is more likely to require coordinated updates, and that scope gets agreed before work begins.

How do you prove no data was lost during migration?

A reconciliation method is agreed before migration starts, comparing record counts and key values between source and destination. Every stage of the migration is checked against that method before the next stage proceeds.

What does data modernization cost?

It is priced against the volume of historical data and the number of dependent systems discovered during mapping. A platform migration typically costs less than a schema redesign touching several applications at once.

Can you modernise our pipelines without touching the underlying database?

Yes, pipeline rebuilds are commonly scoped on their own when the database itself is performing fine. The two workstreams share a discipline but do not have to run together.

How long does a typical data migration take?

A straightforward platform migration can close within a few weeks. A schema redesign with many dependent systems runs considerably longer, and the mapping stage gives an honest estimate first.

Do you work with our existing data or analytics team?

Yes, an existing team's knowledge of current pipelines and reports shortens the mapping stage considerably. The engagement is scoped around whatever that team already owns.